
Tinosa INC


TINOSA DLSS Capabilities and Qualifications
-
NAVSEA approved MIL STD 1330D, MIL STD 1622B Cleaning Procedure
-
Class 100,000 Clean room on Site
-
On site USN Qualified Oxygen Clean Instructor
-
On Site USN Qualified Oxygen Clean Workers
-
Successfully Completed NAVSEA DLSS QA Audit
-
Authorized BAUER Compressor Sales and Service Center with Factory Trained Technicians
-
Factory Trained Haskel Oxygen Booster Pump Repair Technicians
-
Authorized Hydraulics International Inc. (HII) Electric Oxygen Booster Repair Facility
-
USN METCAL Authorized Gage Calibration Laboratory, Lab Code 7OC
-
D.O.T Authorized Cylinder Retest Facility, RIN No. I021
TINOSA has extensive experience, including USN Diver Re-entry Control, with the following US Navy Diving and Hyperbaric systems:
​
-
Fly Away Dive Locker (FADL)
-
Fly Away Dive System (FADS III)
-
MK 3 Light Weight Dive System (LWDS)
-
Fly Away Recompression Chamber (FARCC)
-
Standard Navy Double Lock Recompression Chamber (SNDL)
-
RC 6500 Recompression Chamber System
-
Transportable Recompression Chamber System (TRCS)
-
MK 6 Light Weight Dive System
-
MK 16, MK 25 and SCUBA
-
All local installed Diver’s Breathing Air, Oxygen and Mixed Gas Systems
TINOSA provides outstanding DLSS Re-Certification Services with Re-Entry Control Documentation.
​
USS Tinosa History

USS Tinosa
SSN 606
NUCLEAR POWERED ATTACK SUBMARINE
KEEL LAID 24 SEPTEMBER 1959
AT PORTSMOUTH NAVAL SHIPYARD
MERITORIOUS UNIT COMMENDATION 1972
MERITORIOUS UNIT COMMENDATION 1991








